MSFS 2024 · General Aviation

Daher TBM 850 (Black Square) Emergency Procedures

Daher TBM 850 (Black Square) Emergency Procedures - Full Reference

All 6 procedures with immediate action steps, in full.

Engine Fire - On Ground

Immediate actions · 7 steps

  1. 1
    Power LeverIDLE
  2. 2
    Condition LeverCUTOFF
  3. 3
    Fuel ShutoffOFF
  4. 4
    Firewall ShutoffCLOSED
  5. 5
    Battery and GeneratorOFF
  6. 6
    Fire extinguisherUSE if accessible
  7. 7
    EVACUATE immediately

Engine Failure - After Takeoff

Immediate actions · 8 steps

  1. 1
    Airspeed120 KIAS best glide
  2. 2
    Condition LeverCUTOFF
  3. 3
    PropellerCONFIRM FEATHERED
  4. 4
    Land straight aheadDO NOT turn back below 1,000 ft AGL
  5. 5
    Fuel ShutoffOFF
  6. 6
    Landing GearDOWN when landing is assured
  7. 7
    FlapsAS REQUIRED
  8. 8
    BatteryOFF before touchdown

Engine Failure - In Flight (Airstart)

Immediate actions · 8 steps

  1. 1
    Airspeed120 KIAS best glide
  2. 2
    Landing FieldSELECT and turn towards it
  3. 3
    Fuel SelectorSWITCH TANK, confirm fuel available
  4. 4
    Boost PumpON
  5. 5
    IgnitionON
  6. 6
    Condition LeverCUTOFF then LOW IDLE for the relight attempt
  7. 7
    ITTMONITOR through the start
  8. 8
    If no relightsecure the engine and complete the forced landing

Pressurisation Failure / Emergency Descent

Immediate actions · 7 steps

  1. 1
    Oxygen MaskON, 100 percent
  2. 2
    Power LeverIDLE
  3. 3
    Landing GearDOWN to increase drag
  4. 4
    Descend at the maximum safe speed
  5. 5
    Level off at 10,000 ft or the minimum safe altitude
  6. 6
    Pressurisation ControllerCHECK settings and bleed source
  7. 7
    Declare an emergency and divert

Landing Gear - Emergency Extension

Immediate actions · 7 steps

  1. 1
    AirspeedREDUCE below 178 KIAS
  2. 2
    Gear HandleDOWN
  3. 3
    Hydraulic PressureCHECK
  4. 4
    Emergency ExtensionACTIVATE and allow the gear to free-fall
  5. 5
    Gear PositionCONFIRM 3 GREEN
  6. 6
    Do not attempt to retract after an emergency extension
  7. 7
    Land as soon as practical and declare the condition to ATC

Generator Failure

Immediate actions · 6 steps

  1. 1
    GeneratorRESET (OFF then ON)
  2. 2
    Voltage and LoadCHECK
  3. 3
    If the generator will not come back onlineSHED electrical load
  4. 4
    Non-essential equipmentOFF
  5. 5
    Battery endurancePLAN on limited time
  6. 6
    Land as soon as practical