DCS World · Transport
C-130J Super Hercules Kneeboard
Startup ChecklistPrints at actual size
C-130J Super HerculesFLIGHT2.9.0Checklist
DATE PILOT TAIL
01Pre-Flight Planning8 steps
Weather Briefing (METAR / TAF / Sigmet)REVIEWED
NOTAMs / Mission BriefREVIEWED
Flight Plan / RoutePLANNED
Fuel PlanningVERIFIED
Weight & Balance / Cargo ManifestWITHIN LIMITS
Performance - Takeoff DataCALCULATED
Divert BasesIDENTIFIED
Crew BriefingCOMPLETE
02Electrical Power Up5 steps
Battery SwitchON
Battery VoltageCHECK - minimum 24 V
External Power (GPU)CONNECT (if available)
AC InvertersON
Essential Avionics BusVERIFY powered
03APU Start5 steps
APU Master SwitchON
APU Start SwitchCRANK
APU GeneratorON - verify bus powered
APU Bleed AirON
External PowerDISCONNECT (if APU running)
04Avionics / FMS Setup11 steps
Avionics Master SwitchesON (sequentially)
Flight Management System (FMS)INITIALIZE
FMS - Present PositionENTER / VERIFY
FMS - Flight Plan / WaypointsLOADED
HUDON - verify display active
INS / Navigation AlignmentALIGNED
ACAWS (Aircraft Caution and Warning System)CHECK - no abnormal warnings
Radios (UHF / VHF)SET departure frequencies
Transponder / IFFSET assigned code - STBY
AltimetersSET QNH / field elevation
Heading IndicatorALIGNED with magnetic compass
05Engine Start13 steps
Fuel Shutoff Valves - All EnginesOPEN
Engine Start - #3INITIATE
Engine 3 - TIT / N1MONITOR - TIT rising smoothly
Engine 3 IdleSTABLE - TIT, torque, oil pressure in limits
Engine Start - #4INITIATE
Engine 4 IdleSTABLE - all parameters normal
Engine Start - #2INITIATE
Engine 2 IdleSTABLE
Engine Start - #1INITIATE
Engine 1 IdleSTABLE - all 4 engines running
Engine GeneratorsON (all four) - verify buses powered
APU Bleed AirOFF (engines providing bleed)
APU MasterOFF
06Post-Start / Ground Check9 steps
All Engine ParametersCHECK in limits
PropellersVERIFY all turning smoothly - no vibration
Flight ControlsFREE and correct full deflection
TrimSET for takeoff - elevator and rudder neutral
FlapsSET takeoff position (50%)
Landing GearDOWN and LOCKED - 3 greens
Hydraulic SystemsCHECK - all pressures in normal range
Cabin Pressure / Bleed AirCHECK - pressurisation scheduled
CargoSECURED and doors CLOSED
07Taxi7 steps
Parking BrakeRELEASE
Taxi LightsON
Navigation LightsON
Transponder / IFFALT RPTG ON (as required)
BrakesCHECK during first movement
Flight InstrumentsCHECK during taxi
Engine InstrumentsMONITOR - all 4 engines normal
08Before Takeoff12 steps
Parking BrakeSET (holding position)
Flight ControlsCHECKED - free and correct
FlapsCONFIRM 50% (takeoff setting)
TrimSET for takeoff weight and CG
V-SpeedsCONFIRM Vr / V2 for takeoff weight
Departure BriefingCONFIRMED
ACAWSCHECK - no warnings
Transponder / IFFAS REQUIRED
Landing LightsON
Strobe LightsON
ATC / Tactical ClearanceOBTAINED
Parking BrakeRELEASE when cleared onto runway
09Takeoff8 steps
BrakesHOLD on runway
ThrottlesADVANCE to takeoff power
Engine InstrumentsCONFIRM - all 4 at full power
RudderCONTROL - maintain centreline
Rotate at VrSMOOTH back pressure - 10-12 deg nose up
Positive ClimbCONFIRMED
Landing GearUP
BrakesAPPLY briefly then release after gear up
10After Takeoff / Climb10 steps
FlapsRETRACT to 0% above 160 kts
Climb PowerSET - TIT at 932 C (max continuous)
AutopilotENGAGE (if required)
Landing GearCONFIRM UP and locked
FlapsCONFIRM retracted - 0%
Landing LightsOFF above 10,000 ft
PressurisationCHECK - cabin altitude scheduling
AltimeterSET STD above transition altitude
Fuel BalanceCHECK - transfer as required
Engine ParametersMONITOR all 4 - TIT, torque, oil normal
11Cruise / Transit7 steps
AltitudeVERIFY level at cruise altitude
Cruise PowerSET - TIT ~900 C, airspeed ~290-320 kts
Engine InstrumentsCHECK all 4 - all parameters in limits
Fuel QuantityCHECK and balance tanks as required
FMS ProgressMONITOR waypoints and ETAs
RadiosSET for next sector / tactical frequency
Tactical AwarenessMAINTAIN - radar / TCAS monitoring
12Descent / Approach13 steps
Destination Weather / ATISOBTAINED
Approach BriefingCOMPLETED
Descent ClearanceOBTAINED
PowerREDUCE for descent
AltimeterSET local QNH at transition level
10,000 ft - Landing LightsON
Approach SpeedREDUCE to 180-200 kts for configuration
FlapsEXTEND 50% below 200 kts
Landing GearDOWN - 3 greens confirmed
FlapsFULL 100% for landing
TrimADJUST for approach speed and configuration
Approach SpeedSTABILISE at Vapp (~130-150 kts based on weight)
Stable ApproachVERIFY by 500 ft AGL
13Landing8 steps
Short FinalON SPEED and GLIDEPATH
FlareGENTLE back pressure at 30-50 ft
ThrottlesREDUCE to idle at flare
TouchdownMAIN GEAR first
PropellersREVERSE - advance throttles into beta range
BrakesAPPLY progressively as speed decreases
CentrelineMAINTAIN with rudder steering
Below 60 ktsPROPELLERS out of reverse - return throttles to idle
14After Landing7 steps
Runway VacatedCONFIRMED
FlapsRETRACT to 0%
Landing LightsOFF or TAXI
Strobe LightsOFF
Transponder / IFFSTBY or OFF
AltimeterSET local QNH
Taxi to ParkingFOLLOW ground / ATC instructions
15Shutdown15 steps
Parking BrakeSET
Taxi / Landing LightsOFF
Engine CooldownIDLE for 2 min
Engine 1 Fuel CutoffCLOSE
Engine 2 Fuel CutoffCLOSE
Engine 3 Fuel CutoffCLOSE
Engine 4 Fuel CutoffCLOSE
All PropellersCONFIRM stopped / at rest
FMS / AvionicsSHUT DOWN
APUSTART (if external power required at park)
Engine GeneratorsOFF
Navigation LightsOFF
AC InvertersOFF
Battery SwitchOFF
Cargo / RampSECURE or OPEN for offload as required
flightchecklist.app/dcs/c-130jFor flight simulation use onlyCard 1 / 1