DCS WORLD · Transport
C-130J Super Hercules Emergency Procedures
C-130J Super Hercules Emergency Procedures - Full Reference
All 6 procedures with immediate action steps, in full.
Engine Fire - In Flight
Immediate actions · 8 steps
- 1Affected throttleIDLE
- 2Affected engine fuel cutoffCLOSE
- 3Affected engine fire handlePULL
- 4Fire extinguisher agent 1DISCHARGE
- 5Wait 30 seccheck fire warning extinguished
- 6If fire persists: fire extinguisher agent 2DISCHARGE
- 7Bleed air (affected engine)OFF
- 8Land at nearest suitable airfield
Engine Failure - In Flight
Immediate actions · 8 steps
- 1Affected throttleIDLE
- 2Affected engine fuel cutoffCLOSE
- 3Propeller (affected)FEATHER (if auto-feather did not activate)
- 4Rudder trimADJUST to compensate for asymmetric thrust
- 5Remaining enginesINCREASE power as required
- 6Maintain altitude if possible with 3 engines at climb power
- 7Declare emergency if unable to maintain altitude
- 8Land at nearest suitable airfield
Hydraulic System Failure
Immediate actions · 8 steps
- 1Affected hydraulic systemIDENTIFY on gauges
- 2Alternate hydraulic systemACTIVATE (crossfeed if available)
- 3Landing gear (if affected)USE alternate extension
- 4BrakesSWITCH to auxiliary hydraulic system
- 5Expect increased control forces
- 6Avoid abrupt control inputs
- 7Plan full runway length for landing
- 8Land as soon as practical
Emergency Descent (Pressurisation Loss)
Immediate actions · 8 steps
- 1Crew oxygen masksON immediately
- 2MAYDAYDECLARE on guard (243.0 MHz)
- 3ThrottlesIDLE
- 4DescentINITIATE to 10,000 ft or MEA
- 5AirspeedVmo or max safe for configuration
- 6Seat belt signON
- 7ATCADVISE altitude and intentions
- 8PressurisationCHECK for resealing possibility
Generator Failure / Electrical Emergency
Immediate actions · 8 steps
- 1Failed generatorIDENTIFY on bus tie panel
- 2Generator resetATTEMPT (cycle generator switch)
- 3Bus tieCLOSE to transfer loads
- 4Non-essential electrical loadsSHED
- 5BatteryVERIFY online as backup
- 6Essential avionics onlyMAINTAIN powered
- 7Land within 20-30 min (battery endurance)
- 8Declare emergency if dual generator failure
Ditching / Forced Landing
Immediate actions · 8 steps
- 1MAYDAYDECLARE position and intentions
- 2Crew and passengersBRIEF emergency positions
- 3CargoJETTISON if time permits to reduce weight
- 4Landing gearUP (water ditching) / DOWN (land)
- 5FlapsFULL
- 6Approach speedVref + 10 kts minimum
- 7EnginesSHUTDOWN on touchdown
- 8EVACUATE immediately via nearest exits